Hospital Passenger Elevator Refurbishment

The VCT in this elevator had failed due to age and the heavy traffic this elevator sees. IPS was called for a solution.

The IPS flake system was installed. The flexible properties of this seamless system handle the movement and heavy traffic perfectly. Problem Solved!
Commercial Freight Elevator

The floor in this freight elevator was in poor condition. Traditional floor coverings could not hold up to the extreme heavy traffic. IPS was called for a solution.

IPS installed our flake broadcast system to the metal floor. Our system has held up perfectly in this elevator and has been adopted as the standard across the rest of the facility. Problem Solved!
Hospital Elevator

The vinyl floor in this elevator had failed and needed a permanent repair. IPS was called for a solution.

IPS installed our flake broadcast system in a custom color. The facility was impressed with the system and chose to upgrade five additional elevator cars with the same floor!
Failed VCT Replacement

The VCT in this elevator was constantly failing. The facility was making repairs every few months and was in need of a permanent fix. IPS was called for a solution.

IPS installed our flake broadcast system. No more monthly repairs are required. Problem Solved!