top of page
20220627_095118.jpg

Corridor Applications

Bio/Lab Hallway Refurbished

20210827_154700.jpg

The welded vinyl in this corridor had failed in multiple spots and was due for an upgrade.

20210827_200145.jpg
20210828_101359.jpg

IPS installed our flake broadcast system with integral cove base. This facility will enjoy this high-performing upgrade for years to come!

All of the inferior materials were removed and the concrete prepped via dustless diamond grinding.

Firehouse Corridor Upgraded

20170925_093941.jpg
20170927_094807.jpg

The old flooring in this firehouse had failed due to water intrusion. IPS recommended our epoxy system as a permanent solution. 

IPS installed our epoxy quartz floor with integral cove base. This new system is impervious to any future water intrusion that may occur. Problem Solved!

Operating Suite Upgraded

20190914_022111.jpg

This medical facility upgraded to the IPS flake system from the old welded vinyl floors.

20190914_130911.jpg

I'm a paragraph. Click here to add your own text and edit me. It's easy.

20190914_130329.jpg

Stunning floors ready for decades of service!

Service Corridor Floor Protected

hallway1.png

This service corridor floor was bare concrete and was difficult to keep clean. The facility wanted to be able to protect and easily maintain the space.

hallway2.png

IPS installed our non-skid system with integral cove base. The floor is permanently protected and is performing flawlessly over a decade later.

COPYRIGHT 2025 by Industrial Polymer Services INC. ALL RIGHTS RESERVED. 

bottom of page