Patient Bathroom Upgrade

This bathroom floor was dated and due for an upgrade. IPS was called for a solution.

IPS installed our quartz broadcast system with integral cove base.

Beautiful floor ready for decades of service!
Shower Pan Restoration

This shower pan at a medical facility had begun leaking into the space below. Replacement was not an option as this is an active patient area.

IPS installed our quartz broadcast system with integral cove base. The pan is now permanently sealed and was returned to service in 24 hours.
Bathroom with Expansion Joint Sealed

This patient bathroom was leaking water into the space below. IPS was called for a solution.

IPS installed our flake broadcast system with integral cove base after installing our SmartJoint system. The leak is permanently stopped and the floor is upgraded! Problem Solved!
Bathroom Floor Upgrade

The welded vinyl floor in this bathroom had failed and required replacing. IPS was called for a solution.

The failed vinyl was removed and the concrete substrate was prepared via dustless diamond grinding.

The IPS flake broadcast system was the perfect system for this space. Problem solved!
Old Floor Restored

This old tile in this bathroom had failed and was removed. This facility wanted a new floor that was safer and easier to maintain. IPS was called for a solution.

After prepping and leveling the floor, IPS installed a seamless non-skid system. The new floor has the perfect texture for this space. Problem solved!
Bathroom Threshold Refurbished

This threshold was causing a major bump and was restricting access to this bathroom.

Height difference of 1/2 inch between the bathroom and corridor after old threshold removal.

IPS used 100% solids epoxy screed to form a new threshold. The new transition restored easy access to the bathroom.

Problem solved!